AAC block supplier on barter for Badlapur sites: lightweight AAC blocks (Siporex, Magicrete, Biltech, Aerocon), fly-ash bricks and jointing mortar, delivered floor-wise and settled against units.
Badlapur is the last of the Central line suburbs before the hills: Badlapur East's Katrap and Belavali, Badlapur West's Hendrepada, and affordable townships along the Ulhas river.
Affordable townships of 7 to 18 floors with 1 and 2 BHKs; low-rise row-houses on the edges.
Truck-load pallets at night, crane-unloaded, stacked on the slab being worked; two floors' worth per delivery.
Affordable projects here choose between AAC and fly-ash bricks on cost; we quote both.
First-time buyers from Kalyan, Ambernath and Dombivli. That is who our inventory desk sells to when we take units here, which is why material-only barter in Badlapur is typically 15–25% below the developer's rate rather than deeper.
Bundled with contracting in Badlapur, the flats are taken at 35% below market and one work order covers structure and material.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
| Products | AAC blocks 4", 6", 8", 9"; fly-ash bricks; block adhesive; ready-mix plaster |
|---|---|
| Brands | Siporex, Magicrete, Biltech, Aerocon, UltraTech Xtralite, local ISI plants |
| Lot size | 1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks |
| Delivery | Pallet delivery with crane unloading; floor-wise scheduling |
| Pricing basis | Per cu m or per block, brand-wise |
| Documents | IS 2185 test report, GST invoice, e-way bill |
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Yes. We supply aac blocks & bricks to projects in Badlapur and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Pallet delivery with crane unloading; floor-wise scheduling
Truck-load pallets at night, crane-unloaded, stacked on the slab being worked; two floors' worth per delivery.
Yes. Units are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing. We work only with RERA-registered projects or projects where registration is in process.
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
For material-only supply in Badlapur the barter rate is usually 15–25% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
Other services in Badlapur:
Send the BOQ and the units you can allot. Proposal in 48 hours.