AAC block supplier on barter · Wadala

AAC Blocks & Bricks on barter in Wadala

Supply of aac blocks & bricks to Wadala projects, priced at daily Mumbai rates and settled in flats or units instead of cash.

Home / Services / AAC Blocks & Bricks Mumbai / Wadala
Wadala · Central Mumbai · Harbour line

Supplying Wadala

Wadala is the truck terminal, the Monorail depot, the BPT land and the IMAX belt, where MMRDA has planned a new business district and townships of several thousand flats are under way.

Township-scale projects of 30 to 60-storey towers with clubhouses and large podiums, plus society redevelopment in Wadala West's older colonies.

Trailer-load deliveries direct from the plant, unloaded by crane into a block yard, with block adhesive and ready-mix plaster in the same load.

Townships here consume lakhs of blocks; we deliver wing by wing from the plant on a locked rate.

Professionals working in BKC and Lower Parel who want a large modern township at a lower rate than Parel. That is who our inventory desk sells to when we take units here, which is why material-only barter in Wadala is typically 10–15% below the developer's rate rather than deeper.

Bundled with contracting in Wadala, the flats are taken at 35% below market and one work order covers structure and material.

AAC
AAC Blocks & Bricks · Wadala · highway access for trailer-load deliveries
Specification

Specification

ProductsAAC blocks 4", 6", 8", 9"; fly-ash bricks; block adhesive; ready-mix plaster
BrandsSiporex, Magicrete, Biltech, Aerocon, UltraTech Xtralite, local ISI plants
Lot size1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks
DeliveryPallet delivery with crane unloading; floor-wise scheduling
Pricing basisPer cu m or per block, brand-wise
DocumentsIS 2185 test report, GST invoice, e-way bill
Settlement

Barter, half-barter or cash

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Process

How a deal runs

01

Share drawings

Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.

02

Receive the quote

Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.

03

Fix the barter rate

Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.

04

Sign work order + ATS

Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.

05

Build and settle

Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.

FAQ

AAC Blocks & Bricks in Wadala: questions

Do you supply aac blocks & bricks in Wadala on barter against flats?

Yes. We supply aac blocks & bricks to projects in Wadala and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.

Can aac blocks & bricks be bundled with contracting in Wadala?

Yes. Most developers bundle aac blocks & bricks with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.

How do deliveries work at Wadala sites?

Trailer-load deliveries direct from the plant, unloaded by crane into a block yard, with block adhesive and ready-mix plaster in the same load.

Is the Wadala barter deal RERA-compliant?

Yes. Units are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing. We work only with RERA-registered projects or projects where registration is in process.

What if material prices move during supply to Wadala?

Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.

How soon can supply start in Wadala?

Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Pallet delivery with crane unloading; floor-wise scheduling

Also serving

Around Wadala

Other services in Wadala:

Searches this page answers
fly ash bricks supplier wadalasiporex dealer wadalablock adhesive supplier wadalaaac blocks supplier wadalaaac block dealer wadalaaac blocks price wadalalightweight blocks wadalaaac blocks supplier central mumbaiaac block dealer central mumbaisiporex dealer central mumbaiaac blocks & bricks against flats wadalabarter construction wadalaconstruction material supplier wadala

Need aac blocks & bricks in Wadala without paying cash?

Send the BOQ and the units you can allot. Proposal in 48 hours.

💬📞