AAC block supplier on barter for Nariman Point sites: lightweight AAC blocks (Siporex, Magicrete, Biltech, Aerocon), fly-ash bricks and jointing mortar, delivered floor-wise and settled against units.
Nariman Point is Mumbai's original business district: Mittal Towers, Express Towers, the Air India building and the office blocks along Marine Drive that are now forty to fifty years old.
Work here is refurbishment of ageing office towers, floor-plate strengthening, façade replacement and, increasingly, conversion of office stock to serviced residences.
Commercial projects here use AAC for partitions and shafts; external walls are often glazed or precast.
Trailer-load pallets crane-unloaded into a block yard; we deliver wing by wing against the masonry programme.
Occupiers are banks, law firms and family offices paying the highest office rents in the country, so owners refurbish rather than sell. That is who our inventory desk sells to when we take units here, which is why material-only barter in Nariman Point is typically 8–15% below the developer's rate rather than deeper.
Bundled with contracting in Nariman Point, the flats are taken at 35% below market and one work order covers structure and material.
| Products | AAC blocks 4", 6", 8", 9"; fly-ash bricks; block adhesive; ready-mix plaster |
|---|---|
| Brands | Siporex, Magicrete, Biltech, Aerocon, UltraTech Xtralite, local ISI plants |
| Lot size | 1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks |
| Delivery | Pallet delivery with crane unloading; floor-wise scheduling |
| Pricing basis | Per cu m or per block, brand-wise |
| Documents | IS 2185 test report, GST invoice, e-way bill |
Yes. We supply aac blocks & bricks to projects in Nariman Point and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Pallet delivery with crane unloading; floor-wise scheduling Smaller requirements can be clubbed with a neighbouring site in Nariman Point if the timing works.
Trailer-load pallets crane-unloaded into a block yard; we deliver wing by wing against the masonry programme.
IS 2185 test report, GST invoice, e-way bill. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Pallet delivery with crane unloading; floor-wise scheduling
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Other services in Nariman Point:
Send the BOQ and the units you can allot. Proposal in 48 hours.