Lightweight AAC blocks (Siporex, Magicrete, Biltech, Aerocon), fly-ash bricks and jointing mortar, delivered floor-wise and settled against units. Serving Grant Road and the rest of South Mumbai.
Grant Road covers Lamington Road's electronics market, Nana Chowk, Gowalia Tank and the cessed buildings that fill every street between the station and Tardeo.
Cessed-building and small cluster redevelopment produce 15 to 22-storey buildings; ground floors stay commercial because the street trade is too valuable to lose.
Redevelopment buildings here use 6-inch AAC for external walls and 4-inch internal, with block adhesive to keep wall thickness down on tight floor plates.
Truck-load pallets at night, crane-unloaded, stacked on the slab being worked; two floors' worth per delivery.
Shop owners and Gujarati business families from the same wards; retail bays sell before flats do. That is who our inventory desk sells to when we take units here, which is why material-only barter in Grant Road is typically 10–18% below the developer's rate rather than deeper.
Masonry packages are settled against a fractional unit or clubbed with the RCC package in a single agreement. Combine it with barter contracting in Grant Road for a single settlement at 35% below market.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
| Products | AAC blocks 4", 6", 8", 9"; fly-ash bricks; block adhesive; ready-mix plaster |
|---|---|
| Brands | Siporex, Magicrete, Biltech, Aerocon, UltraTech Xtralite, local ISI plants |
| Lot size | 1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks |
| Delivery | Pallet delivery with crane unloading; floor-wise scheduling |
| Pricing basis | Per cu m or per block, brand-wise |
| Documents | IS 2185 test report, GST invoice, e-way bill |
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply aac blocks & bricks to projects in Grant Road and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
Pallet delivery with crane unloading; floor-wise scheduling Smaller requirements can be clubbed with a neighbouring site in Grant Road if the timing works.
1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
IS 2185 test report, GST invoice, e-way bill. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Pallet delivery with crane unloading; floor-wise scheduling
Other services in Grant Road:
Send the BOQ and the units you can allot. Proposal in 48 hours.