AAC block supplier on barter for Mazgaon sites: lightweight AAC blocks (Siporex, Magicrete, Biltech, Aerocon), fly-ash bricks and jointing mortar, delivered floor-wise and settled against units.
Mazgaon is the dockyard, Bhandarwada Hill, the Portuguese-era churches and the mixed Catholic and Muslim neighbourhoods on the slopes between Byculla and the harbour.
Cluster and society redevelopment on hill plots, 18 to 30 floors, with harbour views on the upper floors and shops at street level.
Pallets lifted by tower crane from the road; deliveries limited to what the crane can lift in a night window.
Rehab wings here use fly-ash bricks or AAC depending on the scheme budget; sale wings use AAC throughout.
Local families and dockyard and port employees; harbour-view flats sell first. That is who our inventory desk sells to when we take units here, which is why material-only barter in Mazgaon is typically 12–20% below the developer's rate rather than deeper.
Bundled with contracting in Mazgaon, the flats are taken at 35% below market and one work order covers structure and material.
| Products | AAC blocks 4", 6", 8", 9"; fly-ash bricks; block adhesive; ready-mix plaster |
|---|---|
| Brands | Siporex, Magicrete, Biltech, Aerocon, UltraTech Xtralite, local ISI plants |
| Lot size | 1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks |
| Delivery | Pallet delivery with crane unloading; floor-wise scheduling |
| Pricing basis | Per cu m or per block, brand-wise |
| Documents | IS 2185 test report, GST invoice, e-way bill |
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply aac blocks & bricks to projects in Mazgaon and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
IS 2185 test report, GST invoice, e-way bill. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
Pallets lifted by tower crane from the road; deliveries limited to what the crane can lift in a night window.
1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
Yes. Units are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing. We work only with RERA-registered projects or projects where registration is in process.
Other services in Mazgaon:
Send the BOQ and the units you can allot. Proposal in 48 hours.