AAC block supplier on barter · Mazgaon

AAC Blocks & Bricks on barter in Mazgaon

AAC block supplier on barter for Mazgaon sites: lightweight AAC blocks (Siporex, Magicrete, Biltech, Aerocon), fly-ash bricks and jointing mortar, delivered floor-wise and settled against units.

Home / Services / AAC Blocks & Bricks Mumbai / Mazgaon
Mazgaon · South Mumbai · Harbour line

Supplying Mazgaon

Mazgaon is the dockyard, Bhandarwada Hill, the Portuguese-era churches and the mixed Catholic and Muslim neighbourhoods on the slopes between Byculla and the harbour.

Cluster and society redevelopment on hill plots, 18 to 30 floors, with harbour views on the upper floors and shops at street level.

Pallets lifted by tower crane from the road; deliveries limited to what the crane can lift in a night window.

Rehab wings here use fly-ash bricks or AAC depending on the scheme budget; sale wings use AAC throughout.

Local families and dockyard and port employees; harbour-view flats sell first. That is who our inventory desk sells to when we take units here, which is why material-only barter in Mazgaon is typically 12–20% below the developer's rate rather than deeper.

Bundled with contracting in Mazgaon, the flats are taken at 35% below market and one work order covers structure and material.

AAC
AAC Blocks & Bricks · Mazgaon · slopes that rule out trailers
Specification

Grades, brands and lot sizes

ProductsAAC blocks 4", 6", 8", 9"; fly-ash bricks; block adhesive; ready-mix plaster
BrandsSiporex, Magicrete, Biltech, Aerocon, UltraTech Xtralite, local ISI plants
Lot size1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks
DeliveryPallet delivery with crane unloading; floor-wise scheduling
Pricing basisPer cu m or per block, brand-wise
DocumentsIS 2185 test report, GST invoice, e-way bill
Settlement

How the work order is settled

Zero cash outflow
100%

100% barter

Entire work-order value settled in flats

Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.

Most common
50/50

50% barter + 50% payment

Half in flats, half on running-account bills

Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.

Cash

100% payment

Standard contracting on RA bills

We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.

Process

From drawings to registered flats

01

Drawings in

Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.

02

Quote out

Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.

03

Rate agreed

Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.

04

Paper signed

Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.

05

Site starts

Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.

FAQ

FAQ for Mazgaon developers

Do you supply aac blocks & bricks in Mazgaon on barter against flats?

Yes. We supply aac blocks & bricks to projects in Mazgaon and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.

What if material prices move during supply to Mazgaon?

Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.

What documents come with each delivery to Mazgaon?

IS 2185 test report, GST invoice, e-way bill. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.

How do deliveries work at Mazgaon sites?

Pallets lifted by tower crane from the road; deliveries limited to what the crane can lift in a night window.

Which brands of aac blocks & bricks do you deliver to Mazgaon?

1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks. The brand is fixed in the MOU; substitutions only with written approval from your PMC.

Is the Mazgaon barter deal RERA-compliant?

Yes. Units are allotted under the project's MahaRERA registration through a registered agreement for sale and appear in your quarterly RERA filing. We work only with RERA-registered projects or projects where registration is in process.

Also serving

Other areas we cover

Other services in Mazgaon:

Searches this page answers
block adhesive supplier mazgaonsiporex dealer mazgaonfly ash bricks supplier mazgaonaac blocks on barter mazgaonlightweight blocks mazgaonaac blocks price mazgaonaac blocks supplier mazgaonaac blocks supplier south mumbaiaac block dealer south mumbaisiporex dealer south mumbaiaac blocks & bricks against flats mazgaonbarter construction mazgaonconstruction material supplier mazgaon

AAC Blocks & Bricks for Mazgaon, settled in units.

Send the BOQ and the units you can allot. Proposal in 48 hours.

💬📞