Supply of aac blocks & bricks to Nahur projects, priced at daily Mumbai rates and settled in flats or units instead of cash.
Nahur is the newest station on the Central line, between Bhandup and Mulund, with mid-rise and township launches on both sides of the tracks and the Eastern Express Highway a few hundred metres away.
Mid-rise and township projects of 20 to 40 floors with 1, 2 and 3 BHKs; regular plots, Mivan construction.
Trailer-load deliveries direct from the plant, unloaded by crane into a block yard, with block adhesive and ready-mix plaster in the same load.
Townships here consume lakhs of blocks; we deliver wing by wing from the plant on a locked rate.
Families from Mulund and Bhandup, and buyers who want a new launch at a lower rate than Mulund West. That is who our inventory desk sells to when we take units here, which is why material-only barter in Nahur is typically 10–15% below the developer's rate rather than deeper.
Masonry packages are settled against a fractional unit or clubbed with the RCC package in a single agreement. Combine it with barter contracting in Nahur for a single settlement at 35% below market.
| Products | AAC blocks 4", 6", 8", 9"; fly-ash bricks; block adhesive; ready-mix plaster |
|---|---|
| Brands | Siporex, Magicrete, Biltech, Aerocon, UltraTech Xtralite, local ISI plants |
| Lot size | 1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks |
| Delivery | Pallet delivery with crane unloading; floor-wise scheduling |
| Pricing basis | Per cu m or per block, brand-wise |
| Documents | IS 2185 test report, GST invoice, e-way bill |
Yes. We supply aac blocks & bricks to projects in Nahur and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Pallet delivery with crane unloading; floor-wise scheduling
IS 2185 test report, GST invoice, e-way bill. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
For material-only supply in Nahur the barter rate is usually 10–15% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
Yes. Most developers bundle aac blocks & bricks with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
Yes. Any ratio works; many developers settle finishing-stage material in cash and structure-stage material in units.
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Other services in Nahur:
Send the BOQ and the units you can allot. Proposal in 48 hours.