Supply of aac blocks & bricks to Dombivli projects, priced at daily Mumbai rates and settled in flats or units instead of cash.
Affordable projects here choose between AAC and fly-ash bricks on cost; we quote both.
Dombivli is the MIDC town turned bedroom suburb: Dombivli East's Manpada Road, Dombivli West's Gandhi Nagar, Palava on the Kalyan–Shil Road and a station that handles more commuters than most cities.
Mid-income townships of 20 to 35 floors along Kalyan–Shil Road and Manpada, society redevelopment of 8 to 15 floors in the older east and west wards.
Trailer-load deliveries direct from the plant, unloaded by crane into a block yard, with block adhesive and ready-mix plaster in the same load.
Marathi and Gujarati families from Dombivli and Kalyan, and first-time buyers from Thane. That is who our inventory desk sells to when we take units here, which is why material-only barter in Dombivli is typically 15–25% below the developer's rate rather than deeper.
Bundled with contracting in Dombivli, the flats are taken at 35% below market and one work order covers structure and material.
| Products | AAC blocks 4", 6", 8", 9"; fly-ash bricks; block adhesive; ready-mix plaster |
|---|---|
| Brands | Siporex, Magicrete, Biltech, Aerocon, UltraTech Xtralite, local ISI plants |
| Lot size | 1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks |
| Delivery | Pallet delivery with crane unloading; floor-wise scheduling |
| Pricing basis | Per cu m or per block, brand-wise |
| Documents | IS 2185 test report, GST invoice, e-way bill |
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Send architectural and structural drawings, elevation, floor plates and the RERA number. We take off quantities and build an item-rate BOQ.
Quote per sq ft built-up or item-rate, separately for conventional RCC, Mivan or traditional as the structure demands. Barter, 50/50 and cash options side by side.
Flats in the same project are valued at 35% below the current market rate. Work-order value ÷ barter rate = carpet area allotted to us.
Work order with milestone table, barter MOU and registered agreements for sale on the allotted flats. Escrow or milestone release as your lender permits.
Mobilise in 15 days. Milestones certified by your PMC; flats released to us against certified value, RA bills for any cash component.
Yes. We supply aac blocks & bricks to projects in Dombivli and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks. The brand is fixed in the MOU; substitutions only with written approval from your PMC.
Yes. Most developers bundle aac blocks & bricks with the structure work order so the whole package is settled in flats at 35% below market, with deliveries mapped to slab milestones.
IS 2185 test report, GST invoice, e-way bill. Everything is mapped to the agreement ledger and reconciled monthly against the allotted value.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Pallet delivery with crane unloading; floor-wise scheduling
Other services in Dombivli:
Send the BOQ and the units you can allot. Proposal in 48 hours.