AAC block supplier on barter for Ghatkopar sites: lightweight AAC blocks (Siporex, Magicrete, Biltech, Aerocon), fly-ash bricks and jointing mortar, delivered floor-wise and settled against units.
Ghatkopar is the Gujarati capital of the eastern suburbs: Pant Nagar, Garodia Nagar, Tilak Road, the Metro terminus, Ghatkopar West's Jain temples and hundreds of 1960s to 80s societies.
Society redevelopment of 15 to 25 floors with 2 and 3 BHKs; Garodia Nagar and Pant Nagar are the busiest redevelopment belts on the Central line.
Truck-load pallets at night, crane-unloaded, stacked on the slab being worked; two floors' worth per delivery.
Redevelopment buildings here use 6-inch AAC for external walls and 4-inch internal, with block adhesive to keep wall thickness down on tight floor plates.
Gujarati and Jain families from the same societies; every launch sells locally before advertising. That is who our inventory desk sells to when we take units here, which is why material-only barter in Ghatkopar is typically 10–18% below the developer's rate rather than deeper.
Bundled with contracting in Ghatkopar, the flats are taken at 35% below market and one work order covers structure and material.
| Products | AAC blocks 4", 6", 8", 9"; fly-ash bricks; block adhesive; ready-mix plaster |
|---|---|
| Brands | Siporex, Magicrete, Biltech, Aerocon, UltraTech Xtralite, local ISI plants |
| Lot size | 1 truck (approx. 700–900 blocks) minimum; project supply 50,000 to 10 lakh blocks |
| Delivery | Pallet delivery with crane unloading; floor-wise scheduling |
| Pricing basis | Per cu m or per block, brand-wise |
| Documents | IS 2185 test report, GST invoice, e-way bill |
Flats allotted at 35% below the project's current market rate. Best when the developer wants zero cash outflow on structure.
Flats at 35% below market for the barter half; RA bills for the cash half. The most common structure for redevelopment schemes.
We also take pure cash contracts on competitive item rates when the developer prefers to keep inventory.
Architectural and structural sets, elevation, floor plates and the RERA number. Our estimators take off quantities and build an item-rate BOQ within three working days.
Per sq ft built-up or item-rate, shown for conventional RCC, Mivan or traditional as the structure allows, with barter, 50/50 and cash columns side by side.
Flats in the same project valued at 35% below today's rate. Work-order value divided by that rate gives the carpet area we receive; the unit schedule goes into the MOU.
Work order with milestone table, barter MOU, registered agreements for sale on the allotted flats, escrow or milestone release as the lender permits.
Mobilisation inside 15 days. Your PMC certifies milestones; flats release to us against certified value, RA bills cover any cash share.
Yes. We supply aac blocks & bricks to projects in Ghatkopar and settle against flats, shops or units of the same project at an agreed barter rate, with GST invoices on every delivery and a registered agreement for the allotted units.
Material rates are either locked per delivery or reset monthly against a published index; the barter rate for units is locked for the supply period. Both mechanisms are written into the MOU.
Indicative proposal within 48 hours of receiving the BOQ, site meeting within the week, first delivery within 7 to 10 days of the signed MOU. Pallet delivery with crane unloading; floor-wise scheduling
We do. Once a unit is released to us against delivered value, selling it is our problem, not the developer's. The developer's sales pricing is not affected.
For material-only supply in Ghatkopar the barter rate is usually 10–18% below the developer's current sales rate. When the material is bundled into a contracting work order, flats are valued at 35% below market.
Truck-load pallets at night, crane-unloaded, stacked on the slab being worked; two floors' worth per delivery.
Other services in Ghatkopar:
Send the BOQ and the units you can allot. Proposal in 48 hours.